Company Picnic with TSN and ASI
The Steel Network graciously invites FDR Engineers to take part in company events. There is no better work community than this!
The Steel Network graciously invites FDR Engineers to take part in company events. There is no better work community than this!
FDR Engineers is excited to be celebrating its fourth anniversary!
Floor joist assembly consists of cold-formed steel (CFS) joists, a metal deck with concrete topping or sheathing attached to the top joist flange, and discrete or continuous bracing attached to the joist bottom flange.
Buildings with sufficient lateral stiffness will suffer less non-structural damage, which means less cracking in walls and finishes, less water infiltration, and increased durability.
Recent Comments