
Central Station
Phoenix, Arizona
Project Overview
Central Station is a two-tower mixed-use development in downtown Phoenix, built above a working transit center at street level. The 33-story Maeve tower and the 22-story ANOVA tower share a rooftop pool and an entertainment venue between them. FDR Engineers provided the cold-formed steel engineering, the design of the prefinished exterior wall panel system, and the exterior cladding design, working for MKB Construction under general contractor Layton Construction. Project completed in 2025.
FDR Scope
Cold-formed steel engineering, prefinished exterior wall panel design, and exterior cladding design for both towers.
Gallery 3 images


